A 7-step process requiring builders to cut and install 4x8 sheathing and use metal hardware such as stud-to-plate connectors, strapping, threaded rods, as well as install blocking at horizontal joints.
Upside: Meets hurricane code.
Downside: Very costly. time/labor/material-intensive with more chance of errors and code infractions.
|