|
|
| Installation |
| Solarbord structural panels are to be installed according to the APA’s (The Engineered Wood Association) Construction Guide E30 and the appropriate building code. Below are some key installation points. |
| |
| Solarbord® on Roofs |
- Make sure rafter alignment is uniform and square.
- Allow a minimum of 1/8” spacing between ends and edges of panels.
- Check local building codes for roof ventilation requirements.
- For maximum performance, protect Solarbord® panels from moisture prior to and during installation. Exposure to certain moisture conditions could result in development of mould & mildew.
- Cover roof as soon as possible with shingle underlayment (or #15 roofing felt) to protect panels from weather. If construction delays are anticipated, cover with #30 roofing felt.
- Place Solarbord® Radiant Barrier Sheathing panels on rafters – foil side facing down, toward the attic air space.
- Do not allow insulation or other materials to come in contact with the foil surface of Solarbord®. Maintain minimum 3/4” airspace. The use of baffles is recommended.
- Allow Solarbord® Radiant Barrier Sheathing to adjust to atmospheric conditions before installing shingles. (Heavier weight or textured shingles provide better performance than lightweight fiberglass shingles).
- Fastener spacing*
|
| Solarbord® on Gables |
- Install the Solarbord® panels with foil side facing in, toward the attic space.
- Allow 3/4” air space between foiled surface and all other building materials in the attic.
- Use 8d nails to fasten panels to studs. Maintain 1/8” spacing between panel ends and edges.
- Keep Solarbord® panels protected from the elements prior to, during and after installation.
|
| Consult your local building codes for local requirements and specifications and APA Construction Guide E30. |
| |
| Click here to access the new Norbord Solarbord OSB product website |
| |
| Click here for the OSB Information Sheet (PDF - 114KB) |
| |
| Click here to go to the APA website |
|
 Solarbord Green Build Sheet |
|
|